Cities, Governors, and Mayors: Have the Data Center Without the Fight

Your city wants the data center. The tax base, the jobs, the investment.

But your community is fighting it — over water, over power, over the strain on the grid.

Wonkot Business and Economic Development LLC, Plainview, Texas, has the answer.

We build finished, off-grid power for data centers: the three-prong hybrid power skid, 60 MW blocks delivered in 60 to 90 days, with closed-loop cooling that draws zero water and puts no strain on your grid. No natural gas. No pipeline. No five-year wait.

The data center comes. Your residents keep their water and their power.

Wonkot is a consulting firm and a business developer, and our services carry a fee.

If your city wants the benefits of a data center without all the hoopla, contact our company: wonkotholdings@gmail.com | (806) 729-0408 | wonkotbusiness.com

— CRITICAL INFRASTRUCTURE

The demand is real. The grid connection is the bottleneck.

Across West Texas, Wonkot Business and Economic Development delivers dedicated behind-the-meter power solutions in Plainview, bypassing transmission delays and localized resource limitations.

Interconnection Queues

Water Constraints

Government Mandates

Hyperscale data centers and high-density compute facilities wait five to seven years in regional transmission queues, delaying commercial operations while centralized grid operators struggle to expand regional high-voltage capacity.

Modern cooling towers demand millions of gallons daily, creating fierce competition with local agriculture and municipalities. Closed-loop, behind-the-meter installations eliminate regional water strain while ensuring continuous cooling uptime.

Evolving federal reliability rules and statutory energy mandates place escalating compliance burdens on heavy power consumers, forcing developers to look beyond traditional regulated utilities for firm, localized generation.

Behind the meter, the queue does not apply.

Others sell queue positions. We sell capacity.

Generation at the load — Power produced on site, behind the meter — no interconnection position to wait for.

Dispatch on the operator's schedule — Output follows the campus load profile, sequenced by design: solar, then battery, then engine.

No water drawn for cooling — Closed-loop cooling removes the water objection before it is raised.

A queue position is a promise about a process. Capacity is a physical thing — megawatts generated where they are consumed, under the operator's control.

Wonkot Business and Economic Development LLC is building that capacity as a repeatable product: a standardized hybrid power skid, assembled into 60 MW blocks, up to a 600 MW program architecture. The system is designed to run without natural-gas infrastructure and without water for cooling — the two dependencies that most often stop a project before it starts.

The result is a power supply that answers the three pressures directly: no queue to join, no water to defend, and a design that gives regulators and communities a concrete proposal to evaluate instead of an open-ended draw on shared resources.

One skid. Three sources, one dispatch order.

The building block of the system is a 1.5 MW hybrid power skid. Every skid dispatches its sources in the same fixed order — select a stage to see how the sequence works.

First — dispatched first

Solar

Photovoltaic generation carries the load whenever the sun is producing.

Second — stored energy

Battery

Storage covers the gaps — clouds, transitions, and the evening ramp.

Third — on demand

Engine

A dual-liquid engine generates when solar and storage are exhausted.

Block architecture — ten blocks, 600 MW

Bigger than big: 60 MW in a block, 600 MW in the program, delivered in weeks instead of years.

Capacity is delivered in standardized 60 MW blocks — forty 1.5 MW power skids and forty zero-water cooling units per block — so a buyer can contract for one block or scale across the full ten-block, 600 MW architecture without redesigning the system.

Monitoring, not guessing

Dr. Allen has been successfully monitoring the market — not guessing it. The record, dated:

- Self-supplied, low-water power is the answer — confirmed when Oracle replaced gas turbines with fuel cells in a private microgrid.

- Federal policy rewards co-located generation — confirmed by the Secretary of Energy's fast-track letter to FERC.

- Buyers pay before energization — confirmed when Liberty Power Innovations collected a capacity-fee prepayment worth hundreds of millions before its first contract.

- Permits are the bottleneck — confirmed by Memphis and the TCEQ suspensions.

- Power is the critical path — confirmed when compute began deploying in 14 days.

Wonkot is the lifeline for those drowning in their own money and in their own way. The build begins on the first mobilization fee or the first investor wire. We are looking at the future, at the shape it is taking, and at what will sustain it.

Two doors, kept separate on purpose.

Buyers and investors need different documents, under different terms. Each branch below starts with a written request — nothing is published openly that belongs under agreement.

For capacity buyers

For data center operators and developers evaluating behind-the-meter capacity in 60 MW blocks.

Policy memorandum — The company's capacity policy — how blocks are structured, allocated, and governed. Available on request under NDA.

Audit scorecard — The company's internal audit scorecard for the program. Available on request under NDA.

Block pricing — Released only on an explicit allocation request. No pricing is published, and none is quoted outside that process.

Commercial unit is one 60 MW block. Allocation request is the only path to pricing.

For investors

An introduction to the company and the thesis behind it — offered as the start of a conversation, not a solicitation.

The company — A Texas LLC developing behind-the-meter power capacity, with its target manufacturing location in Plainview, Texas.

The thesis — Grid queues, water limits, and government mandates have made delivered capacity — not generation in the abstract — the scarce asset in the data center build-out.

The conversation — Discussion is held under NDA. Participation in any offering is limited to verified accredited investors.

All company communication is conducted in writing. Requests are answered from wonkotholdings@gmail.com.

Written channel, answered in writing.

wonkotholdings@gmail.com

(806) 729-0408

Plainview, Texas — Central Time.

Target manufacturing location.

Wonkot Weekly Information Report — Issue No. 1 (Week of November 16, 2026)

WONKOT WEEKLY INFORMATION REPORT

Issue No. 1 — Week of November 16, 2026

Wonkot Business and Economic Development LLC, Plainview, Texas

This report begins a standing weekly series. Each issue records what moved in the data-center power market, what moved at Wonkot, and what is next — in writing, as the information evolves.

THE MARKET THIS WEEK

— On November 16, the Texas Commission on Environmental Quality approved roughly 3,500 MW of behind-the-meter natural-gas plants for data centers in a single day, by standard permit registration with no public notice. The backlash organized within 48 hours: demands for an investigation, for the permits to be overturned, and for the commissioners' resignations. No lawsuit has been filed against the registrations; a Clean Air Act suit requires a 60-day notice first. Gas behind the meter is now the contested path in Texas.

— On November 17, Giga Energy announced Project Clay — a 60 MW project sold explicitly as zero-water and designed to meet the incoming governor's stated priorities. The non-gas, zero-water architecture is being validated in the open market at exactly the 60 MW block size.

— On November 19, the United States Senate passed the BAAJA legislation, 62–33. Its full-cost rule for large data-center loads — loads of 20 MW and above carry their full associated costs — now awaits House action before Congress ends on January 3, 2027. Grid connection is getting more expensive by statute; off-grid power is not subject to the queue or the charge.

— Also on November 19, the Ohio Power Siting Board approved 2,150 MW of behind-the-meter generation for data centers in one day — the Vantage Fairfield project (1,350 MW plus a 1,040 MW battery) and the PowerConneX Ashville plant (800 MW) — both explicitly not connected to the public grid. The behind-the-meter model is becoming the national precedent, not the exception.

— One legal development bears watching: a case already filed in federal court argues that every combustion source on a data-center campus counts toward a single aggregated total. Power that adds no combustion to a site adds nothing to that count.

AT WONKOT THIS WEEK

— On November 18, the offering documents were executed: the Written Consent and Amendments No. 1 and No. 2, effective that day. The capital raise is fully papered. Wonkot issues the Class B non-voting units; subscription funds are received by Allen Trinity Legacy Holdings LLC, the holding company, and move down to Wonkot only as needed for operational usage, as a capital contribution.

— The engine program advanced: technical answers went to Warren CAT on November 18, and quotations from Warren CAT and Cummins are due November 30. The engine data feeds the Texas Standard Permit 6005 filing, which is assembled and scheduled for December 7 — worked back from a benchmark written approval in early January, ahead of the January 19 change of administration in Austin.

— The offer stands: a base raise of $25 million — 12,500 Class B non-voting units at $2,000 per unit, $50,000 minimum. The offering memorandum follows under NDA when a firm replies.

WHAT IS NEXT

— November 30: vendor quotations due (Warren CAT, Cummins).

— December 7: Standard Permit 6005 registration filed.

— December 9: Starbase and Cochise County votes on data-center projects.

— December 10: ERCOT's final large-load information report.

— January 19, 2027: the governor-elect takes office; the permitting window this program is executing against closes into a new administration.

Issue No. 2 follows next week.

Respectfully,

Dr. Eugene Allen

Principal Managing Director

Wonkot Business and Economic Development LLC

Written channel only: wonkotholdings@gmail.com

This page is general information about the company and its technology. It is not an offer to sell, or a solicitation of an offer to buy, any security, and it publishes no pricing or offering terms. Buyer documents are provided under NDA on request; block pricing is released only in response to an explicit allocation request. Any discussion with investors is introductory, is held under NDA, and is limited to verified accredited investors.

© 2026 Wonkot Business and Economic Development LLC. All rights reserved.